MVP cost calculator
Estimate MVP effort and cost from editable feature-hour ranges, design, integrations, contingency and rates. Export the complete scope assumptions privately.
Make the scope visible before the budget.
Break a proposed first version into named features and lower/upper effort estimates. Add work that is not already in those estimates, choose a platform multiplier and compare hourly rates. The report preserves the scope so you can revise a number instead of relying on an opaque estimate.
Free to use. No signup. Output: Effort, cost and capacity scenarios + TXT.
How to use MVP cost calculator
- Enter up to 30 feature lines using name | lower hours | upper hours.
- Add design and integration work, a platform multiplier, contingency, rates and weekly capacity.
- Review effort, costs and the capacity-based timeline, then copy or download the scope report.
Worked example: Estimate one focused web version
All hours, rates and contingency are illustrative editable assumptions. Calendar dependencies, revisions, hosting, maintenance and vendor terms can change actual cost.
- Example input
Core: 40–60 hours; sign-in: 12–20. Design: 16 hours. Two extra integrations at 12 hours each. 20% contingency. $50–$100/hour; 20 project hours/week.
- Expected output
110.4–144 estimated hours. Cost scenarios: $5,520–$14,400. Capacity-based duration: 5.52–7.2 weeks.

Questions, answered
Are the example hours a quote for my product?
No. They are illustrative starting assumptions. Replace them with scope estimates from your own team or suppliers. This calculator does not assess a codebase, infer requirements or promise a delivery date.
How do integrations and platforms affect the estimate?
Additional integration count times integration hours is added to feature and design hours. The platform multiplier applies to that total, followed by contingency. Do not count an integration twice if its work already appears in your features.
What does the timeline measure?
It divides estimated effort by your entered weekly project capacity. It does not schedule dependencies, approvals, recruitment or parallel work. Treat it as a capacity scenario and keep the report for review.